Metro Gold Line Eastside Extension Project Management Oversight

Improving route efficiency, passenger access, and safety on a major metropolitan transit line.
  • Metro Gold Line Eastside Extension tunnel-Gannett Fleming

    The Metro Gold Line Eastside Extension includes 1.7 miles of tunnel.

Client
U.S. Department of Transportation, Federal Transit Administration
Location
Los Angeles, California
Our Role
Project Management Oversight, Design Management, Cost Estimating, Construction Scheduling, Construction Management, Quality Assurance Planning.
Data
Size:
6 miles
Construction Cost:
$899 million
Completed:
2009
Type:
New Construction
Duration:
2 years 4 months
Outcomes
  • Increases efficiency by connecting the existing Gold Line to Pasadena without a transfer
  • Improves passenger access and safety
  • Street improvements around each station provide a healthier walking and bicycling environment
  • Accelerated project timeframe serves as a model for future regional projects.

The Metro Gold Line Eastside Extension is a 6-mile-long, dual light rail transit (LRT) alignment that includes 1.7 miles of tunnel, offering the Eastside faster and more convenient access to multiple destinations. The line starts at Union Station in downtown Los Angeles, where it connects with the Pasadena Gold Line LRT and ends at Atlantic Boulevard Station. Eight stations were included in the project scope; six are street level and two are below grade. Two park-and-ride maintenance and storage requirements will be met through a reconfiguration of the existing facilities at the Metro Gold Line Division No. 21/Midway Yard. 

The ridership forecast for the Eastside Extension LRT system is 23,000 daily boarding by 2020. The new stations will serve diverse Los Angeles neighborhoods, such as the Arts District, Little Tokyo, and Boyle Heights. The extension connects the Eastside by rail to downtown Los Angeles, Pasadena, San Fernando Valley, South Bay, Long Beach, and all points in between. Metro worked with the local community since 1991 to plan and develop the details of this rail project and provide continued communication with the community through construction.

What We Did

Gannett Fleming provided project management oversight (PMO) services for the Metro Gold Line Eastside Extension LRT project. Our firm’s PMO team monitored these projects on behalf of the Federal Transit Administration, Region IX, by undertaking independent assessments of project development and implementation. The tasks included project management plans, quality assurance plans, design management and progress, cost estimates, construction scheduling, and construction management. Our firm also reviewed quarterly mitigation-measure status reports.

Key Features

  • Project management
  • Project development assessments
  • Quality assurance plans
  • Design management
  • Cost estimates
  • Construction scheduling
  • Construction management
  • Startup integrated testing and safety certification.

Similar Projects: Transit & Rail Systems: Catenary, Federal, Program Management/Construction Management: Program Management, Transit & Rail: Rail Stations & Intermodal Facilities, Transportation: Transit & Rail, Transit & Rail: Transit & Rail Systems, Transportation, Federal: Transportation, Transportation: Tunnels